A new air duct system

When I moved into my first house, I did not realize the work that came with it.

I thought the beach house just needed a little replaces here as well as there… What it absolutely needed was to be gutted as well as totally redone.

That is why I got it for such a low price. Overtime I have done the work necessary to get my beach house functional. I had to get all the plumbing ripped out as well as replaced with copper. I had to get the electric rewired. I also needed to remove the air ducts from the home. This required my walls as well as ceiling all to be ripped down. Then the Heating, Ventilation as well as A/C corporation ripped out the 8 inch metal ductwork. Afterwards, I had to drywall as well as paint over the new walls. The reason that ductork had to go is that it was disfigured beyond repair. I guess critters got into the house as well as chewed aggressively into the ductwork. The Heating, Ventilation as well as A/C business could not perform deep enough duct sealing to service it. I wanted ductless Heating, Ventilation as well as A/C anyway. This allows for zone control as well as is better for the air quality. After the removal of the ductwork as well as new walls, I had to get the new Heating, Ventilation as well as A/C set up. I then set up thermostats in each room for zone control. After everything was all finished, the beach house temperature control was perfect. I care about having ductless Heating, Ventilation as well as A/C as well as zone control. But, the road to getting it was a rough, time consuming as well as luxurious a single. At particular points in the journey I thought about giving up as well as just doing portable Heating, Ventilation as well as A/C.

 

Radiant floor heating

Leave a Reply

Your email address will not be published.